Built to last two hundred years.
Drawing to buildingKilnworks, Stoke-on-Trent, 2023
An architecture practice of forty, in London and a converted pottery works in Stoke. We build homes, libraries and halls in brick, timber and lime, and we count the carbon from the first sketch.
Selected projects
All 5 projects64 homes for social rent. Sixty-four homes for social rent around a shared yard, in a dark, hand-made brick laid in Flemish bond.
Built · 410 kgCO₂e/m²Visitor centre and field station. A timber building on stilts at the edge of the marsh, built to be taken apart if the sea comes.
Built · 240 kgCO₂e/m²Pottery works into 40 studios. A Victorian pottery works, saved and turned into forty studios and a public kiln.
Built · 160 kgCO₂e/m²Carbon, counted
Upfront, per m²- 5
- buildings in national awards since 2019
- 40
- people in London and Stoke
- 64%
- less upfront carbon than a typical UK building
- 0
- projects without a carbon count
How we work
The studio- 01Listen
Brief, site and budget, with the people who will use the building.
4–6 weeks - 02Shape
Options in models and drawings, carbon counted from the first sketch.
8–12 weeks - 03Detail
Planning, then every junction drawn; materials chosen with the builder.
4–8 months - 04Build
We stay on site until handover, and come back after a year to see how it works.
As long as it takes
News
- Oct 2026Holloway Library tops out
The roof light is on; the library opens next autumn.
- Jul 2026Wharf Lane wins a Housing Design Award
Judges called it "social housing that looks like it will last two hundred years".
- May 2026We are hiring in Stoke
Three roles in the retrofit team at Kilnworks.